| 期刊名称: |
GPS Solutions |
| 全部作者: |
Yanyan Liu*,Shirong Ye,Weiwei Song,et al |
| 出版年份: |
2016 |
| 卷 号: |
DOI: 10.1007/s10291-016-0525-1 |
| 期 号: |
|
| 页 码: |
|
| 查看全本: |
|
The main challenge of ambiguity resolution in
precise point positioning (PPP) is that it requires 30 min or
more to succeed in the first fixing of ambiguities. With the
full operation of the BeiDou (BDS) satellite system in East
Asia, it is worthwhile to investigate the performance of
GPS ? BDS PPP ambiguity resolution, especially the
improvements of the initial fixing time and ambiguity-fix-
ing rate compared to GPS-only solutions. We estimated the
wide- and narrow-lane fractional-cycle biases (FCBs) for
BDS with a regional network, and PPP ambiguity resolu-
tion was carried out at each station to assess the contri-
bution of BDS. The across-satellite single-difference
(ASSD) GPS ? BDS combined ambiguity-fixed PPP
model was used, in which the ASSD is applied within each
system. We used a two-day data set from 48 stations. For
kinematic PPP, the percentage of fixing within 10 min for
GPS only (Model A) is 17.6 %, when adding IGSO and
MEO of BDS (Model B), the percentage improves signif-
icantly to 42.8 %, whereas it is only 23.2 % if GEO is
added (Model C) due to the low precision of GEO orbits.
For static PPP, the fixing percentage is 32.9, 53.3 and
28.0 % for Model A, B and C, respectively. In order to
overcome the limitation of the poor precision of GEO
satellites, we also used a small network of 10 stations to
analyze the contribution of GEO satellites to kinematic
PPP. We took advantage of the fact that for stations of a
small network the GEO satellites appear at almost the same
direction, such that the GEO orbit error can be absorbed by
its FCB estimates. The results show that the percentage of
fixing improves from 39.5 to 57.7 % by adding GEO
satellites.